Secure Channel

Direct Signal to Qatar 5G Operations

This is the engineering and partnership intake channel. We filter generic requests to prioritize specific deployment scenarios. If you have site coordinates, infrastructure specs, or a defined integration scope, you are speaking to the right queue.

Start Intake Process

Intake Guidelines & Routing

Response Windows: Enterprise inquiries are routed to the engineering queue (24h response). General partnership proposals are reviewed by the strategic desk (48h response).

Security Protocol: All submitted data—site coordinates, building schematics, proprietary use cases—are handled under strict NDA protocols. We do not share intake data with third parties. Do not send classified or restricted government documentation via this form.

Encrypted Uplink // Engineering Queue

Coverage & Site Survey Logistics

Accuracy in the intake phase dictates deployment speed. We map high-density urban cores against industrial corridors; the hardware stack differs significantly. Provide coordinates or building schematics to avoid the 48-hour clarification loop.

Map Visualization: Qatar Density Overlay
Figure 1. Overlay zones indicate high-density urban vs. industrial corridors. Equipment configurations vary by attenuation profile.

Pitfall to Avoid

Generic address lookups fail for site surveys. We require specific coordinates or roof access details. Lack of power availability data delays the feasibility study by 72 hours.

Intake Checklist

  • • Coordinates
  • • Access Hours
  • • Power Specs
  • • Fiber Distance
  • • Line-of-Sight
  • • Use Case

Trade-off: Speed vs. Accuracy

Rapid deployment may require temporary CPE placement for testing. Permanent mounting requires structural analysis. Choose based on campaign timeline.

Rooftop Mount Rig
Cable Runs
Power Supply Unit

Partnership Integration Matrix

Timeline: 2–8 Weeks

Tier 1

ISP Backhaul

Carrier-grade antenna arrays. High capacity.

Tier 2

Private Network

Gateway units. Dedicated spectrum.

// Flow: Intake → Feasibility → Lab Test → Live Deployment
// Deviation requires executive review.
// SLA definitions locked at Intake stage.

Onboarding Timelines

Sandbox Access 2–4 Weeks
Private Network 6–8 Weeks
Spectrum Approval 30 Days (Min)

Terms of Engagement

SLA
Service Level Agreement. Defines uptime guarantees and latency thresholds. Negotiated at Lab Test phase.
CPE
Customer Premise Equipment. We provide modular units; enterprise IT manages the edge router.

"A retail chain deploying in-store IoT sensors: 3-week lab test, 5-week rollout. Requires clear fiber entry points and 240V power stability."

Physical Headquarters & Secure Dispatch

We ground our digital processes in physical security. In-person meetings are available for partnership finalization or hardware inspections. All visitors must check in at the security desk and are escorted to meeting rooms.

QR

Visitor Badge: Grants lobby + meeting rooms. Engineering floors require secondary clearance.

Al Bidda Tower, West Bay

Parking limited. Recommend Metro or Ride-share.

⚠ Unscheduled drop-ins cannot be processed.

Building Facade / Doha

Entrance, West Bay. All visitors escorted.

Ready to Start the Intake?

Attach schematics or coordinates where possible. Expect an engineering acknowledgment within 24 hours.

Open Intake Form