Direct Signal to Qatar 5G Operations
This is the engineering and partnership intake channel. We filter generic requests to prioritize specific deployment scenarios. If you have site coordinates, infrastructure specs, or a defined integration scope, you are speaking to the right queue.
Intake Guidelines & Routing
Response Windows: Enterprise inquiries are routed to the engineering queue (24h response). General partnership proposals are reviewed by the strategic desk (48h response).
Security Protocol: All submitted data—site coordinates, building schematics, proprietary use cases—are handled under strict NDA protocols. We do not share intake data with third parties. Do not send classified or restricted government documentation via this form.
Coverage & Site Survey Logistics
Accuracy in the intake phase dictates deployment speed. We map high-density urban cores against industrial corridors; the hardware stack differs significantly. Provide coordinates or building schematics to avoid the 48-hour clarification loop.
Pitfall to Avoid
Generic address lookups fail for site surveys. We require specific coordinates or roof access details. Lack of power availability data delays the feasibility study by 72 hours.
Intake Checklist
- • Coordinates
- • Access Hours
- • Power Specs
- • Fiber Distance
- • Line-of-Sight
- • Use Case
Trade-off: Speed vs. Accuracy
Rapid deployment may require temporary CPE placement for testing. Permanent mounting requires structural analysis. Choose based on campaign timeline.
Partnership Integration Matrix
Timeline: 2–8 Weeks
ISP Backhaul
Carrier-grade antenna arrays. High capacity.
Private Network
Gateway units. Dedicated spectrum.
// Flow: Intake → Feasibility → Lab Test → Live Deployment
// Deviation requires executive review.
// SLA definitions locked at Intake stage.
Onboarding Timelines
Terms of Engagement
- SLA
- Service Level Agreement. Defines uptime guarantees and latency thresholds. Negotiated at Lab Test phase.
- CPE
- Customer Premise Equipment. We provide modular units; enterprise IT manages the edge router.
"A retail chain deploying in-store IoT sensors: 3-week lab test, 5-week rollout. Requires clear fiber entry points and 240V power stability."
Physical Headquarters & Secure Dispatch
We ground our digital processes in physical security. In-person meetings are available for partnership finalization or hardware inspections. All visitors must check in at the security desk and are escorted to meeting rooms.
Visitor Badge: Grants lobby + meeting rooms. Engineering floors require secondary clearance.
Al Bidda Tower, West Bay
Parking limited. Recommend Metro or Ride-share.
⚠ Unscheduled drop-ins cannot be processed.
Entrance, West Bay. All visitors escorted.
Ready to Start the Intake?
Attach schematics or coordinates where possible. Expect an engineering acknowledgment within 24 hours.
Open Intake Form